中文
KTTPKota Tinggi · Johor · kttp.myKT Techpark
sales@kttp.my

A dedicated data-centre zone
power, water & fibre solved before you build.

KT Tech Park (KTTP) is an industrial park on the Kota Tinggi–Pengerang corridor, with a purpose-built data-centre zone. Five DC plots plus industry-support lots, available through the developer's sales team.

90 MWDay-one power — 132 kV PMU, 2N redundancy
590.5 MWFull build-out by Jun 2032 — 275 kV PMU, 500 MW reserve
4 RoutesIndependent fibre routes into the park — Sedili 36.7 km · Mersing 90.4 km · Menara Ansar POP 45 km
0Flood record — plinth 10–26 m

// The Plots

PlotAreaFit
A1Confirmed50.04 ac (largest DC plot)Hyperscale / colo anchor — 50 MW+ build
A2TBAFrom master planMid-size colo / regional player
A3TBAFrom master planMid-size colo / regional player
A4TBAFrom master planColo / operator
A5TBAFrom master planFlexible sizing
A2–A5 sizes pending final survey. Earthworks begin 4Q 2026 — early discussions welcome.

// Built For DC Development

POWER — solved

Dedicated 132 kV PMU with 2N redundancy on day one (90 MW). Staged growth to 590.5 MW via 275 kV PMU with 500 MW reserve. 4 GW future solar pipeline. Dual-routing feeds.

WATER — Malaysia's #1 constraint, solved

BAKAJ in-principle approval for raw-water extraction plus river and clean-water supply. The cooling-water input most Malaysian parks can't guarantee.

CONNECTIVITY — two landings

Sedili 36.7 km · Mersing 90.4 km · Menara Ansar POP 45 km. 4 independent fibre routes into the park. 45 km to Singapore checkpoint.

APPROVALS & TIMELINE

Industrial zoning approved · Earthworks begin 4Q 2026 — designed for Tier III/IV with N+1 / 2N architecture.

Interested in a DC plot?

Tell us your capacity and timeline — we'll match you to the right plot.

WhatsApp →

Send opens your mail app addressed to sales@kttp.my — or WhatsApp us directly. NDAs available before detailed data is shared.